The fracturing process induced by different excavation sequence under final highwall with auger mining was numerically simulated.
对界边坡下采用钻机开采煤柱不同开采顺序引起的破坏过程进行了数值模拟。
The obtained self-assembled monolayers were characterized with water contact angle goniometry, auger electron spectroscopy and X-ray photoelectron spectroscopy.