4.The existing calculation methods of inrushing for confined water foundation pit are summarized, and their shortcomings were analyzed.
摘要总结了承压水基坑既有定分析方法,分析每种方法存在的不足。
5.The in situ rock stress prevents the rise of confined water and water inrush for thick floor aquifuge,but for thin floor aquifuge the in situ rock stress wo.