1.Beam side form shall be installed after all work inspected and accepted such as beam rebar work, cushion block laying, steel inserts installation, steel doweling and pocket molding bed, etc.
15.Next, flip the kite over and thread one end of the string through one of the holes and tie it to the dowel, and do the same thing with the other end of the string and the other hole.