1.For lack of the theoretical calculation method at present,the skew bridge backwater is simulated in adopting circle pier and embank uncompressing river through hydraulic models.
3.A short, ragged-edged glacier crawls into it from the south, and on the opposite side it is embanked and dammed by a series of concentric terminal moraines, made by the glacier when it entirely filled the basin.