Programming was done by plugging hundreds of wires into plugboards, sort of like old school telephone switchboards, in order to set up the computer to perform the right operations.
The operator, Tepco, has released a picture of a dead rat near one of the switchboards and suggested that that could have been the cause of the power failure.