1."Over the last part-section of the Base from the location of the tunnel placing Boom, the delivery line is guided by means of a shiftable pipe Bridge.
距隧道布料的最后一段,输送管采用可移动的管道桥。
2.While the market value of a shiftable capital good may exceed its reproduction cost temporarily, the value of capital, in a particular location, can remain permanently below its reproduction cost.