2.Tack out the dowel in lower part of handle of the valve, and undraw the agraffe gently. Rotate handle of the valve clockwise to open valve to begin discharging.
卸下排液阀手柄下侧塑料销子,并轻轻拉开锁扣,将阀门手柄朝顺时针方向扳动以开始排料;
3.Beam side form shall be installed after all work inspected and accepted such as beam rebar work, cushion block laying, steel inserts installation, steel doweling and pocket molding bed, etc.