1.With the signed disqualification inspection report,the quality inspector then requires a replating of the disqualified electroplate products.
能重之不合格开出“内部联络单”通知生管按排“重”;
2.The system not only can be applied in the treatment of electroplate acidulated sewage but also in the effective measurement and control of acidulated sewage and sewage containing other pe...