The maximum depth of the pit is mainly related to the inflow angle, unit discharge and the perviousness of the dike etc. with the maximum impact from the Unit discharge.
透水桩坝的坝前刷坑深度主要与来流单宽流量、入流角、桩坝透水率等因有关,其中单宽流量对刷坑深度的影响。
The maximum depth of the pit is mainly related to the inflow angle, unit discharge and the perviousness of the dike etc. with the maximum impact from the Unit discharge.
透水桩坝的坝前刷坑深度主要与来流单宽流量、入流角、桩坝透水率等因有关,其中单宽流量对刷坑深度的影响。
According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针对高炉WZ-C炉顶装设备存在的布器温度高、透水等问题进行了原因分析,并进行水冷、水封系统改进。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。