1.Based on post-refracturing production data and water cut,considering that only primary fracture exists,its efficiency is coupled by adjusting parame...
考虑重复压缝缝共同作用下,对重复压井进行了产能评价,验证了重复压井中缝有效性。
2.In the treatment of these wells,micro-seismic and tilter meter were used to monitor the fracture spreading.After refracturing,the production histories of oil wells were matched with nume...